Two Reservoir Projects to Watch: Allens Creek and the Colorado County Study
Two real Texas projects at two very different stages, one advancing toward permits with an engineering contract, one still a feasibility study.
Nothing teaches project stages like real projects. Below are two current Texas reservoir efforts, the Brazos River Authority's Allens Creek Reservoir and the Lower Colorado River Authority's Colorado County study, profiled side by side from their sponsors' own records. They are deliberately paired because they sit at different stages, and confusing the two stages is exactly the mistake this resource center exists to prevent.
Project profile 1: Allens Creek Reservoir
- Project sponsor
- Brazos River Authority (BRA)
- Current stage
- Development, engineering contract approved; permitting, design, environmental review, mitigation, financing, and construction still ahead
- General location
- Austin County, just north of Wallis, near the confluence of Allens Creek and the Brazos River
- Project type
- Proposed pumped-storage, off-channel water-supply reservoir
- Official source
- BRA Allens Creek Reservoir project page and the May 15, 2026 BRA project update
- Status last reviewed
- July 12, 2026
According to the Brazos River Authority, Allens Creek Reservoir is a proposed pumped-storage water-supply reservoir in Austin County, just north of the town of Wallis, near where Allens Creek meets the Brazos River. Rather than damming the Brazos, the design calls for building the reservoir beside the river and filling, and refilling, it with pumps at an intake structure, taking river water into storage when flows are adequate and releasing it to downstream customers when needed.
BRA estimates the completed reservoir would provide an annual firm water supply of approximately 99,650 acre-feet to support current and projected growth in the Brazos River Basin. BRA already owns the roughly 9,600-acre Austin County property intended to hold the embankment dam, impoundment, associated flowage easements: outlet control structure, spillway, and administrative facilities, and BRA states that it holds the water-right permit for the project.
On May 13, 2026, at a special-called meeting, the BRA Board of Directors unanimously authorized an $18.8 million work plan and approved a professional-services engineering contract with GFT Infrastructure, Inc. to advance the project's development, a strong public signal of intent to build. BRA announced the action in a project update dated May 15, 2026.
What remains ahead, per BRA's own description: federal Clean Water Act Section 404 authorization from the U.S. Army Corps of Engineers, extensive environmental, flood, cultural, and historic-resource evaluation during permitting and design, mitigation of impacts identified in that process, detailed design, financing, and construction. The reservoir footprint itself is described as being in the early stages of development. As of the review date above, official sources do not describe the reservoir as fully permitted or under construction, and this page does not either.
Project profile 2: Potential Colorado County reservoir
- Project sponsor
- Lower Colorado River Authority (LCRA)
- Current stage
- Feasibility study, no decision to build, no permits, no final boundaries
- General location
- Colorado County, northwest of Eagle Lake, on property LCRA owns
- Project type
- Possible off-channel water-supply reservoir
- Official source
- LCRA Projects for New Water Supply and the February 18, 2026 LCRA news release
- Status last reviewed
- July 12, 2026
Feasibility study, not final approval
A feasibility study examines whether a project may be technically, financially, legally, and environmentally viable. It does not mean that final boundaries, permits, construction, or surrounding land impacts have been approved.
In February 2026, LCRA announced it was moving forward with a feasibility study to determine whether a roughly 2,000-acre property it already owns northwest of Eagle Lake in Colorado County would be suitable for a large new water-supply reservoir, a possible off-channel design, near an existing river intake and pump station.
The study connects to LCRA's long-term water-supply goals: a new off-channel reservoir is one of the strategies in LCRA's Water Supply Resource Report, which the LCRA Board approved in November 2025, and the potential project could help LCRA meet its stated goal of adding about 60,000 acre-feet of water supplies by 2040. LCRA's early figures suggest such a reservoir could potentially hold between 48,000 and 80,000 acre-feet, larger than the Arbuckle Reservoir in Wharton County, which came online in October 2025 as LCRA's first water-supply reservoir in the lower basin.
What is unknown or unsettled, by LCRA's own account: whether the site is suitable at all, the project's cost, its funding, its timetable, its final configuration, and its technical, environmental, and permitting constraints. LCRA has said those specifics will be developed only after the feasibility study is complete. Until then, this is a study of a possibility, not an approved project.
Reading the two projects together
Both are off-channel concepts pursued by river authorities on land the sponsor already owns, and that is where the similarity ends. Allens Creek has a water right, a defined yield estimate, a named engineering contractor, and an authorized development budget; its open questions are federal permitting, design, mitigation, financing, and construction. The Colorado County effort has none of those yet; its open question is the most basic one, whether to pursue a project at all. Describing them as being at the same stage would misinform readers about both.
The key takeaway
Allens Creek is a development-stage project: land and water right in hand, engineering contracted, federal permitting ahead. The Colorado County site is a feasibility study: a question the sponsor is still answering.
Whenever you read about either, check the sponsor's own project page and the review date. Stage labels go stale; official records do not lie about their dates.
Official resources
BRA, Allens Creek Reservoir (proposed); BRA, Allens Creek project update, May 15, 2026; Brazos River Authority (board agendas, actions, and minutes); LCRA, Projects for New Water Supply; LCRA news release, February 18, 2026; LCRA, Water Supply Planning.
Status last reviewed July 12, 2026. Both projects will change status over time, permits may be filed or issued, studies may conclude, boards may act. Confirm the current stage on each sponsor's official project page before relying on this profile. Educational information only.
Project phase, permit status, board actions, and meeting dates change. Follow each sponsor's board agendas and the TWDB announcements page for funding actions, and see How to Track a Texas Water Project for the full method.