Texas Reservoirs and Water-Supply Projects: What Landowners Should Know
The planning system, permits, off-channel reservoirs, unique-site designations, and the early signs a project is advancing.
How Texas water projects move from planning to construction, which agencies decide, which records exist, and how landowners can follow the process.
Texas is planning for long-term population growth, drought risk, aging infrastructure, and changing demand for water. The strategies under consideration include new reservoirs: groundwater projects, pipelines, reuse, desalination, aquifer storage, changes to existing lake operations, and transfers of water between areas.
These projects may provide essential water for homes: farms, cities, businesses, and public services. They may also affect private property, roads: waterways, wildlife habitat, community growth, tax bases, and the future use of rural land.
This resource center explains how projects move from planning to construction, which records are available, which agencies make decisions, and how Texas residents can follow the process before the major decisions are complete.
The following terms are not interchangeable:
A project listed in a regional or state water plan has not necessarily received the permits, land, financing, or approvals required for construction.
Eight plain-language guides, from the statewide planning system down to two named projects and one industrial water request worth studying.
The planning system, permits, off-channel reservoirs, unique-site designations, and the early signs a project is advancing.
Your water bill and your water source are usually two different things. How to trace your community’s supply to its origin.
Percent full, conservation pool, flood pool, and elevation, what the numbers mean and how to avoid misreading them.
An eight-stage timeline from identified need to operation, plus a landowner warning-sign checklist.
Two real projects at two very different stages, with sponsors, status, and official sources for each.
Groundwater, reuse, changed lake operations: aquifer storage, desalination, transfers, and conservation, each with its own footprint.
An eleven-step, records-based method: plans: permits, board agendas, federal notices, funding actions, and public-information requests.
What an early-stage Henderson County proposal shows about industrial water requests, and the questions every community should ask.
Reservoir levels, planning documents, permits, and public notices change. These official sources hold the current information.
Explore where your community’s water comes from, your planning region, projected needs, and recommended strategies.
Find where your community’s water comes fromCurrent conservation storage for monitored Texas water-supply reservoirs, statewide and lake by lake.
View current statewide reservoir levelsTexas’ 16 regional water-planning groups, meeting notices, plans, and how to find the group that covers your county.
Find your regional water-planning groupThe statewide plan adopted every five years, including the Draft 2027 State Water Plan and its recommended strategies.
Review the State Water PlanHow surface-water rights are permitted and amended, with application records and public-notice information.
Search Texas water-right informationOfficial announcements about state water projects, financing programs, and board actions.
Follow TWDB project and funding announcementsThe Corps’ Fort Worth District regulatory program for Texas, Clean Water Act Section 404 permitting and public notices.
Review federal regulatory public noticesHow the Texas Public Information Act works and how any resident can request records from a governmental body.
Learn how to request public recordsPrimary sources for this resource center include the Texas Water Development Board (regional and state water planning, including the Draft 2027 State Water Plan, Phase I, April 16, 2026), the Texas Commission on Environmental Quality (surface-water rights), the U.S. Army Corps of Engineers Fort Worth District (federal Clean Water Act Section 404 review), and the official project pages of the Brazos River Authority and the Lower Colorado River Authority.
Texas Homestead Law provides general educational information. It does not provide legal, engineering, environmental, appraisal, tax, or financial advice. Project boundaries: permitting status, water levels, meeting dates, and public-comment deadlines can change. Confirm current information through the responsible agency and consult an appropriate licensed professional about a specific property or legal matter.
Last reviewed July 12, 2026. Project stages, plans, permits, and data may have changed since that date, verify with official sources before relying on this page.